East Link Final EIS documents

East Link is Sound Transit's voter-approved project to expand light rail from downtown Seattle to the Eastside with stations serving Mercer Island, south Bellevue, downtown Bellevue, Bel-Red, and Redmond's Overlake area. East Link will connect to the Link light rail system between downtown Seattle and Sea-Tac Airport. Sound Transit is also conducting environmental review on a future extension to downtown Redmond.

Federal Transit Administration Record of Decision

The Record of Decision (ROD) culminates over five years of environmental review that Sound Transit undertook in cooperation with community members and local and regional governments. Sound Transit received more than 1,800 comments during the environmental review and held 28 open houses, hearings and workshops to gather community input. The ROD finalizes the alignment that the Sound Transit Board selected through this work, completing the required process under the National Environmental Policy Act.

FTA Record of Decision November 2011 (2.5 mb)

Attachments A and B: Map of Preferred Alternative and Alternatives Considered (3.6 mb)

Attachment C: Mitigation Measures (8.8 mb)

Attachment D Part 1: Comments and Responses (11 mb)

Attachment D Part 2: Additional Comments (13 mb)

Federal Highway Administration Record of Decision

The East Link project will utilize portions of I-90 in Seattle, Mercer Island and Bellevue and will cross over I-405 in Bellevue. The Federal Highway Administration (FHWA) Record of Decision (ROD) allows FHWA to issue subsequent approvals throughout the future of the project on items such as conversion of highway lanes to high capacity transit, air space lease agreements and others.

FHWA Record of Decision November 2011 (5 mb)


 

Availability of the Final Environmental Impact Statement (EIS)

The Executive Summary, DVD or CD of the Final EIS documents are free. Paper copies of the Final EIS are available to review at local libraries - for the list of libraries, please view the Final EIS Executive Summary . Paper copies of the Final EIS and conceptual design drawings are available for purchase for $25 each; technical reports and appendices are $15 each. These documents are available at Sound Transit, Union Station, 401 S. Jackson St., Seattle, WA 98104. To request copies of any environmental document, please contact Elma Borbe at (206) 398-5445 or e-mail at elma.borbe@soundtransit.org.

 


 

East Link Final Environmental Impact Statement documents


Document Title

File Size

Executive Summary 12,500 KB
Final EIS Introduction and Table of Contents 1,664 KB
Chapter 1 Purpose and Need for East Link Project 875 KB
Chapter 2 Alternatives Considered 6,794 KB
Chapter 3 Transportation Environment and Consequences 5,497 KB
Chapter 4 Affected Environment and Environmental Consequences
4.1 Acquisitions, Displacements, and Relocations 149 KB
4.2 Land Use 1,471 KB
4.3 Economics 257 KB
4.4 Social Impacts, Community Facilities, and Neighborhoods 1,605 KB
4.5 Visual and Aesthetic Resources 1,481 KB
4.6 Air Quality and Greenhouse Gases 1,966 KB
4.7 Noise and Vibration 2,527 KB
4.8 Ecosystem Resources 3,240 KB
4.9 Water Resources 3,480 KB
4.10 Energy Impacts 345 KB
4.11 Geology and Soils 457 KB
4.12 Hazardous Materials 785 KB
4.13 Electromagnetic Fields 76KB
4.14 Public Services 150 KB
4.15 Utilities 1,003 KB
4.16 Historic and Archaeological Resources 4,224 KB
4.17 Parkland and Open Space 11,018 KB
Chapter 5 Cumulative Impacts 1,309 KB
Chapter 6 Alternatives Evaluation 288 KB
Chapter 7 Comment Summary 767

Appendices A-G >

Appendices H-K >