Elevated guideway south of Mount Baker Station. |
 |
Pouring concrete on the staircase. |
 |
Paving on northbound MLK at Horton Street. |
 |
Structural steel framework at Mount Baker Station platform looking northbound from the south end of the station. |
 |
Mount Baker Station construction showing the elevated trackway in April 2006. |
 |
Mount Baker Station construction, looking north from the Rainier Valley. Photograph taken April 2006. |
 |
Mount Baker Station construction - building the elevated section near the pedestrian bridge. Photograph taken May 2006. |
 |
Mount Baker Station construction - starting to build the elevated section across Winthrop Street in May 2006. |
 |
Mount Baker Station construction - building the elevated trackway in March 2006. |
 |
Mount Baker Station construction - pouring concrete for the station's columns in February 2006. |
 |
Mount Baker Station construction - pouring concrete for the deck in March 2006. |
 |
Mount Baker Station construction - columns along Martin Luther King Jr. Way S. in February 2006. |
 |
View of the Mount Baker Station area. |
 |
Building the columnns that will support the elevated station. |
 |
Installing the falsework (scaffolding) for the trackway between columns. |
 |
Work along Martin Luther King Jr. Way South. Center of image shows where the aerial track touches down to street level. |
 |
Rebar used for drilled shafts. |
 |
Columns start taking shape in the station area. |
 |
Mount Baker Station area outside the east portal of the Beacon Hill tunnel. |
 |
Installing rebar cage into a drilled shaft. |
 |
Close up of rebar cage and drilled shaft |
 |
Work continues on a support structure that will transition between the tunnel and elevated trackway. |