Tukwila Light Rail Segment - Guideway construction, July 2006.

On the north bank of the Duwamish River at East Marginal Way South, the contractor is building the light rail bridge over the river using a balanced cantilever method of construction. This method involves using two cranes, including the small one in the photo on the top of the bridge. The cranes place on pre-cast concrete segment on each side of the bridge pier at a time to keep the structure balanced.