East corridor/I-90 analysis
When the Sound Transit Board of Directors adopted the updated Long-Range Plan in July 2005, they also directed staff to complete additional analyses for the East Corridor, primarily focused on the I-90 Corridor. The analyses includes a load test to simulate light rail operation on the I-90 bridge, an analysis of the rail joint on the I-90 bridge and a traffic analysis (to be completed by the Washington State Department of Transportation). In addition, a report summarizing the forty-year history of analysis of high capacity transit on I-90 was also prepared. These reports can be found below.
These documents require the free Adobe Reader to view.
East Corridor/I-90 Papers
I-90 Structural Feasibility Study: Monorail Conversion
- Page 1: Executive Summary
- Page 2: Introduction
- Page 3: Reference & Design Criteria
- Pages 4-10: Monorail at Grade with HOV Lanes
- Pages 10-12: Monorail Elevated
- Pages 12-13: Vertical Clearance/Additional Work
- Appendix A: Figures
- Appendix B: Ultimate Capacities
- Appendix C: Beam Top Coat Product Data
- Appendix D: Monorail Vertical Clearance Review
I-90 Floating Bridge Test Program for Light Rail Transit
- Fact Sheet
- Table of Contents
- Cover, Table of Contents & Report Text
- Appendix A-Figures
- Appendix A-Tables
- Appendix B-Part 1
- Appendix B-Part 2
- Appendix B-Part 3
- Appendix B-Part 4
- Appendix B-Part 5
- Appendix B-Part 6
- Appendix C-Traffic Data Count
- Appendix D-Site Conditions Data
- Appendix E-Data File Names and Format
- Appendix F-Part 1
- Appendix F-Part 2
Additional I-90 Studies
- Past and Present I-90/East Corridor HCT Alternative Studies
- Summary sheet: History of Research, I-90 High Capacity Transit
- East Corridor HCT: Summary of I-90 Floating Bridge Studies-Report
- East Corridor HCT: Summary of I-90 Floating Bridge Studies-Attachments
- Summary Sheet: Proven Technology Viable for I-90 Floating Bridge