East corridor/I-90 analysis

 

When the Sound Transit Board of Directors adopted the updated Long-Range Plan in July 2005, they also directed staff to complete additional analyses for the East Corridor, primarily focused on the I-90 Corridor. The analyses includes a load test to simulate light rail operation on the I-90 bridge, an analysis of the rail joint on the I-90 bridge and a traffic analysis (to be completed by the Washington State Department of Transportation). In addition, a report summarizing the forty-year history of analysis of high capacity transit on I-90 was also prepared. These reports can be found below.

These documents require the free Adobe Reader to view.

East Corridor/I-90 Papers

I-90 Structural Feasibility Study: Monorail Conversion

I-90 Floating Bridge Test Program for Light Rail Transit

Additional I-90 Studies