|
 |
Forming for the cantilever section at Mukilteo Station The forming for the cantilever section of the platform with the stainless steel edging being installed. |
 |
Storm drain system being constructed at Mukilteo Station The platform trench drain |
 |
Forming for the cantilever section at Mukilteo Station The forming for the cantilever section of the platform |
 |
Wooden posts for the fence and the street light bases at Mukilteo Station Wooden posts for the fence |
 |
Looking north along the future First Street at Mukilteo Station Looking north along the future First Street |
 |
Foundation preparation at Mukilteo Station Preparing the foundation. |
 |
Steel casing for water main at Mukilteo Station Extending the water main. |
 |
Sounder commuter rail Mukilteo Station aerial photograph Aerial photo of Mukilteo Station |
 |
Sounder commuter rail Mukilteo Station site preperation Site preparation |
 |
Sounder commuter rail Mukilteo Station construction site Demolition |
 |
Sounder commuter rail Mukilteo Station design Artist's conceptual rendering |
 |
View from the Mukilteo Speedway bridge north toward Sounder commuter rail Mukilteo Station Artist's conceptual rendering |