Ballard document archive

Project related documents
TitleDatesort ascendingType
Ballard to Downtown Seattle Transit Expansion Study Presentation (1.21 MB)Presentation to Executive Committee of the Sound Transit Board on Ballard to Downtown Seattle CorridorDec 5, 2013Board of Directors materials
Open house handouts (2.33 MB)Project overview, five corridors identified in the level two analysis, study timeline and process, printable survey, evaluation resultsDec 5, 2013Project information and meeting materials
Open house displays (3.14 MB)Screening process and criteria, public feedback by location, study timeline and process, five corridors identified in the level two analysis, evaluation resultsDec 5, 2013Project information and meeting materials
Open house displays (4.88 MB)Goals and objectives results, maps of eight corridor options, screening criteria, study timeline and other displaysJun 27, 2013Project information and meeting materials
Open house handout (1.19 MB)Maps of eight corridor options, screening criteria, study timeline and information and the open house comment formJun 27, 2013Project information and meeting materials
Open house meeting materials (4.16 MB)Maps, comment forms, charts from open houseMar 13, 2013Project information and meeting materials
Project fact sheet (191.51 KB)Fact sheet includes Sound Transit and SDOT's roles, how to stay informed and moreJan 22, 2013Project information and meeting materials

Types of library documents

Project information and meeting materials
Facts sheets, presentations, display boards

Board of Directors materials
Presentations to the Sound Transit Board

Environmental documents and technical reports
EIS documents, technical memoranda, reports

Other
Videos, illustrations, external links

About these documents

Documents may include graphics and drawings based on the early stages of design. Designs are subject to change as the project progresses. Not all project documents are available online. Contact us if you have questions.