Overlake Village Station

Located adjacent to SR 520 north of the Overlake Village Park-and-Ride on 152nd Avenue NE, the station entrance will be along 152nd Avenue NE, just south of SR 520. This station's design is consistent with the City of Redmond's 152nd Corridor Study and Overlake Village Neighborhood Plan.

 

Mode: Link light rail

Opens for service: Targeted 2023 

Project phase: Construction 

Ride time: Overlake Village to Pioneer Square in about 30 minutes

Key features

  • At-grade open-air station at the core of the developing Overlake Village neighborhood in Redmond
  • Station is along the edge of SR520 with an entrance connected to a pedestrian plaza
  • Passenger drop-off/pickup area along new Plaza street adjacent to 152nd Ave NE
  • Bicycle storage
  • Bicycle and pedestrian bridge spanning SR520
  • Public art

See most recent design materials in the document archive.

Update your subscriber preferences today to receive area-specific updates that include advanced notification for traffic impacts, new construction activities and more. The current construction schedule is below and is subject to change.

2018 East Link construction milestones include:

  • The Rainier Freeway station and D2 bus roadway from I-90 into downtown Seattle will close in the fall for work on the Judkins Park station.
  • Construction starts on the Operations and Maintenance Facility: East (OMF East) in Bellevue.
  • Elevated rail guideway is placed over I-405 in Bellevue.
  • Excavation of the downtown Bellevue tunnel is completed.
  • Post-tensioning of the I-90 floating bridge to prepare it for light rail and increase its lifespan is completed.
  • Road-over-rail undercrossing on 112th Avenue Southeast in Bellevue gets started.
  • Work proceeds on station construction across the entire East Link extension.

  • ARTIST: To be determined
  • DESCRIPTION: STart will commission an artist to develop artwork for the bridge and a landmark for the neighborhood.