Project related documents
TitleDatesort ascendingType
Corridor Report: I-405 (8.62 MB)High capacity transit study, Central and East Corridors report for I-405Oct 8, 2014Environmental documents and technical reports
Corridor Report: U District-Kirkland-Redmond (3.31 MB)High capacity transit study, Central and East Corridors report for U District-Kirkland-RedmondOct 8, 2014Environmental documents and technical reports
Corridor Report: Kirkland-Bellevue-Issaquah (4.92 MB)High capacity transit study, Central and East Corridors report for Kirkland-Bellevue-IssaquahOct 8, 2014Environmental documents and technical reports
Corridor Report: Eastside Rail Corridor (3.88 MB)High capacity transit study, Central and East Corridors report for the Eastside rail corridorSep 30, 2014Environmental documents and technical reports
Corridor Report: Ballard-University District (1.03 MB)High capacity transit study, Central and East Corridors report for Ballard to University DistrictSep 30, 2014Environmental documents and technical reports
South King County HCT Corridor Study Final ReportReport of the South King County study’s process, public involvement and key findingsSep 9, 2014Environmental documents and technical reports
Federal Way to Tacoma HCT Corridor Study Presentation (4.08 MB)Presentation on Federal Way to Tacoma CorridorSep 5, 2014Board of Directors materials
Lynnwood to Everett HCT Corridor Study Final Report - part 1 (9.86 MB)Report of Lynnwood to Everett study’s process, public involvement and key findingsAug 5, 2014Environmental documents and technical reports
Lynnwood to Everett HCT Corridor Study Final Report - part 2 (9.86 MB)Report of Lynnwood to Everett study’s process, public involvement and key findingsAug 5, 2014Environmental documents and technical reports
HCT Corridor Study: Federal Way to Tacoma Final Report (6.8 MB)Final report evaluating options to provide high-capacity transit service between Federal Way Transit Center and Tacoma Dome Station area. Jul 17, 2014Environmental documents and technical reports
South King County HCT Corridor Study Presentation (3.2 MB)Presentation on Downtown-West Seattle-Burien, and Burien-Sea Tac-Tukwila-Renton CorridorsJun 11, 2014Board of Directors materials
Lynnwood to Everett HCT Corridor Study Presentation (1.01 MB)Presentation on the Lynnwood to Everett CorridorJun 9, 2014Board of Directors materials
Ballard to Downtown Seattle Transit Expansion Study Final Report (6.48 MB)Report of the Ballard to Downtown Seattle Transit Expansion Study’s process, public involvement and key findings. Jun 9, 2014Environmental documents and technical reports
Central and East HCT Corridor Study Presentation - Part 2 (3.58 MB)Presentation on University District-Kirkland-Redmond, Ballard-University District, and Kirkland-Bellevue-Issaquah CorridorsJun 5, 2014Board of Directors materials
Central and East HCT Corridor Study Presentation - Part 1 (4.76 MB)Presentation on Eastside Rail Corridor, and I-405 Bus Rapid Transit CorridorMay 1, 2014Board of Directors materials
Ballard to Downtown Seattle Transit Expansion Study Presentation (1.21 MB)Presentation on Ballard to Downtown Seattle CorridorDec 5, 2013Board of Directors materials

Types of library documents

Project information and meeting materials
Facts sheets, presentations, display boards

Board of Directors materials
Presentations to the Sound Transit Board

Environmental documents and technical reports
EIS documents, technical memoranda, reports

Other
Videos, illustrations, external links

About these documents

Documents may include graphics and drawings based on the early stages of design. Designs are subject to change as the project progresses. Not all project documents are available online. Contact us if you have questions.