Tacoma Link Expansion document archive

Project related documents
TitleDatesort ascendingType
Typical 60 foot platform plan (90.51 KB)This is the currently proposed layout of the 60-foot stations.  Apr 18, 2017Project information and meeting materials
Typical 100 foot platform plan (116.25 KB)This is the currently proposed layout of the 100-foot stations. These stations will be at 6th Ave and S. 11th Street along Martin Luther King, Jr. Way. Apr 18, 2017Project information and meeting materials
Platform elevation (400.71 KB)Station platforms will provide seating, coverage from rain, and other features. Apr 18, 2017Project information and meeting materials
60 foot aerial (447.3 KB)This view provides a glimpse at the 60-foot stations. Apr 18, 2017Project information and meeting materials
100 foot aerial (503.14 KB)The 100-foot station from a bird’s eye view. Apr 18, 2017Project information and meeting materials
Tacoma Link Open House presentation (11.73 MB)View the presentation from the Dec. 15, 2016 open house. Dec 20, 2016Project information and meeting materials
Hilltop Presentation (648.79 KB)Platform Workshop Outreach Materials Jun 20, 2016Project information and meeting materials
Stadium District Presentation (658.11 KB)Platform Workshop Outreach Materials Jun 20, 2016Project information and meeting materials
Open House Materials (7.92 MB)Platform Workshop Outreach Materials Jun 20, 2016Project information and meeting materials
Review documents from the Hilltop platform planning workshop May 16, 2016Project information and meeting materials
Review documents from the Stadium District platform planning workshop (7.55 MB)Apr 16, 2016Project information and meeting materials
December open house materials (9.73 MB)Dec 18, 2015Project information and meeting materials
Tacoma Link Expansion Folio - Summer 2015 (3.5 MB)Jul 9, 2015Project information and meeting materials
Tacoma Link Expansion Folio - Summer 2015 (3.5 MB)Tacoma Link Expansion project overview Jul 9, 2015Project information and meeting materials
Tacoma Link Expansion Environmental Evaluation ReportsJun 24, 2015Environmental documents and technical reports
Tacoma Link Expansion Environmental Evaluation ReportsTacoma Link Expansion Environmental Evaluation ReportsJun 24, 2015Environmental documents and technical reports
Tacoma Link Expansion Folio - Fall 2014 (2.67 MB)Tacoma Link Expansion project overviewSep 24, 2014Project information and meeting materials
Tacoma Link Expansion May 2014 Outreach Summary (3.18 MB)Tacoma Link Expansion May 2014 Outreach SummarySep 3, 2014Project information and meeting materials
Tacoma Link Expansion Folio May 2014 (1.22 MB)Tacoma Link Expansion Project Overview May 2014Aug 12, 2014Project information and meeting materials
Tacoma Link Expansion Open House Boards May 2014 (2.33 MB)Tacoma Link Expansion Open House Boards May 2014May 20, 2014Project information and meeting materials
Tacoma Link Expansion Open House Boards May 2014 (6.33 MB)Tacoma Link Expansion Open House Boards May 2014May 20, 2014Project information and meeting materials
Online survey guide (1.07 MB)Background information for online survey coinciding with May 2014 open houseMay 9, 2014Project information and meeting materials
Pierce County TV highlights project milestoneSound Transit Project Manager Sue Comis discusses selection of Tacoma light rail expansion alignment with Pierce County TV anchor Heather RedalMar 6, 2014Project information and meeting materials
Tacoma Link Expansion Council presentation (2.12 MB)Tacoma Link expansion City Council presentationJan 28, 2014Project information and meeting materials
Open house January 2014 display boards (10.51 MB)Includes current timeline, outreach, funding, screening criteria, goals, mapsJan 8, 2014Project information and meeting materials
Tacoma Link Planning Commission presentation (1.64 MB)Tacoma Link expansion planning commission presentationJan 8, 2014Project information and meeting materials
Project folio January 2014 (2.17 MB)Project folio for Tacoma LinkJan 8, 2014Project information and meeting materials
Tacoma City Council presentation (2.22 MB)Tacoma Link expansion study session presentationDec 23, 2013Project information and meeting materials
Infrastructure Planning and Sustainability presentation (1.63 MB)Tacoma Link expansion Infrastructure Planning and Sustainability presentationNov 19, 2013Project information and meeting materials
Expanding Tacoma Link (5.08 MB)Tacoma Link expansion project fact sheetSep 11, 2013Project information and meeting materials
Expansion Alternatives Analysis Report & SEPA AddendumReport and SEPA Addendum, Appendices A and BMay 16, 2013Environmental documents and technical reports
Open house Apr 2013 display - project information (7.25 MB)Includes current timeline, outreach, funding, screening criteria, goals, mapsApr 11, 2013Project information and meeting materials
Open house Apr 2013 display - project evaluation (3.73 MB)Public comments (key themes), alternatives evaluation summaryApr 11, 2013Project information and meeting materials
Open house Apr 2013 display - hybrid corridors (578.04 KB)Maps of hybrid corridors H1 and H2Apr 11, 2013Project information and meeting materials
Open house Apr 2013 display - corridors (4.06 MB)All corridors considered; corridors meeting all screening criteriaApr 11, 2013Project information and meeting materials
Public meeting Mar 2013 display - project information (6.03 MB)Includes outreach, funding, screening criteria, goals, mapsMar 19, 2013Project information and meeting materials
Public meeting Mar 2013 display - corridors (4.06 MB)All corridors considered; corridors meeting all screening criteriaMar 19, 2013Project information and meeting materials
Project folio February 2013 (2.73 MB)Project folio for Tacoma Link Feb 11, 2013Project information and meeting materials
Tacoma Link alternative evaluation: G1- Pacific Highway (963.84 KB)Map with pros and cons for this alternativeFeb 8, 2013Project information and meeting materials
Tacoma Link alternative evaluation: E2 - North Downtown Central Loop (997.16 KB)Map with pros and cons for this alternativeFeb 8, 2013Project information and meeting materials
Tacoma Link alternative evaluation: E1- North Downtown Central (975.41 KB)Map with pros and cons for this alternativeFeb 8, 2013Project information and meeting materials
Tacoma Link alternative evaluation: D4 (Modified) - South End via Portland Ave (1.02 MB)Map with pros and cons for this alternativeFeb 8, 2013Project information and meeting materials
Tacoma Link alternative evaluation: C1- Eastside (993.13 KB)Map with pros and cons for this alternativeFeb 8, 2013Project information and meeting materials
Tacoma Link alternative evaluation: B1- North End Central (1000.07 KB)Map with pros and cons for this alternativeFeb 8, 2013Project information and meeting materials
Tacoma Link early scoping comment summary (1.42 MB)Community comments on proposed Tacoma Link project Jan 11, 2013Project information and meeting materials
Open house Dec 2012 display - corridors that meet all criteria (6.09 MB)Corridors meeting all screening criteriaDec 5, 2012Project information and meeting materials
Open house Dec 2012 display - all potential corridors F through K (5.04 MB)Options F through KDec 5, 2012Project information and meeting materials
Open house Dec 2012 display - all potential corridors A through E (4.76 MB)Options A through EDec 5, 2012Project information and meeting materials
Open house Dec 2012 display - project information (5.92 MB)Includes process graphic, why expand needs and purpose, funding, screening criteria, initial corridor alternatives and why should I provided commentsDec 5, 2012Project information and meeting materials
Open house Dec 2012 - powerpoint presentation with narration videoUpdate on the selection of light rail corridor alternatives (YouTube video)Dec 5, 2012Project information and meeting materials
Project folio December 2012 (1.95 MB)Project folio for Tacoma Link Dec 1, 2012Project information and meeting materials
Early scoping open house summary - report - notifications (291.5 KB)Appendix B, notificationsSep 1, 2012Environmental documents and technical reports
Early scoping meeting guide - handout (42.55 KB)Early scoping open house handoutAug 1, 2012Project information and meeting materials
Why do we need to expand? (needs) - display board (27.52 KB)Board for community thoughts on purpose and needAug 1, 2012Project information and meeting materials
History - display board (196.56 KB)Listing of previous Tacoma Link expansion studiesAug 1, 2012Project information and meeting materials
Modes to be considered - display board (438.35 KB)Light rail, bus and no-build modes explainedAug 1, 2012Project information and meeting materials
Draft project goals and objectives - display board (25 KB)Draft goals and objectives bullet pointsAug 1, 2012Project information and meeting materials
Potential corridors G and H map - display board (4.38 MB)Showing the Pacific Highway and downtown central corridorsAug 1, 2012Project information and meeting materials
Why expand: reasons and purposes - display board (30.7 KB)Reasons and purposes for the Tacoma Link expansionAug 1, 2012Project information and meeting materials
Potential corridors E and F map - display board (4.02 MB)Showing the north downtown central corridor and the south downtown to MLK corridorAug 1, 2012Project information and meeting materials
Comment form - handout (209.82 KB)Request for public comments for early scopingAug 1, 2012Project information and meeting materials
Potential corridors map - display board (4.04 MB)Graphic of potential corridorsAug 1, 2012Project information and meeting materials
Potential corridors C and D map - display board (4.81 MB)Shows the eastside corridor and the sound end corridorAug 1, 2012Project information and meeting materials
Stay involved - handout (280.69 KB)Ways for the community to stay involved with the projectAug 1, 2012Project information and meeting materials
Timeline-process - display board (222.1 KB)Graphic of planned project timeline through Preferred Corridor Identification phaseAug 1, 2012Project information and meeting materials
Potential corridors A and B - display board (3.59 MB)Shows the north end corridor and north end central corridorAug 1, 2012Project information and meeting materials
Survey - handout (230.3 KB)Request for community feedback during scoping phaseAug 1, 2012Project information and meeting materials
What is early scoping - display board (119.84 KB)Description of early scoping, what comments are needed from communityAug 1, 2012
Project corridors map - display board (2.01 MB)Corridors studied in the pre-alternatives analysis; satellite-style mapAug 1, 2012Project information and meeting materials
Community outreach - display board (23.8 KB)Community events we've been toAug 1, 2012Project information and meeting materials
Why should I provide comment? - display board (2.25 MB)Bullet points: community input will help define the best corridor alternativesAug 1, 2012Project information and meeting materials
Potential corridors map - handout (4.04 MB)Corridors studied in the pre-alternatives analysis; satellite-style map handoutAug 1, 2012Project information and meeting materials
What's your vision? - display board (25.04 KB)Board for community visionAug 1, 2012Project information and meeting materials
Project folio - handout (2.46 MB)Alternatives analysis and list of phasesAug 1, 2012Project information and meeting materials
Why do we need to expand? (purpose) - display board (27.52 KB)Board for community thoughts on purpose and needAug 1, 2012Project information and meeting materials
Fact sheet (1.46 MB)Fact sheet for Tacoma Link Jun 1, 2012Project information and meeting materials
Pre-alternatives analysis report (6.31 MB)Report summarizing work and laying the groundwork for items to be addressed in the next phaseSep 1, 2011Environmental documents and technical reports
Stakeholder final group report (1.86 MB)Stakeholders' recommendations on potential corridorsFeb 1, 2011Environmental documents and technical reports
South corridor LRT design - report (539.48 KB)Defines the project between S. 200th Street and Tacoma Dome Station via both the I-5 and the SR 99 corridorsDec 1, 2008Environmental documents and technical reports
Potential extension - west - report (2.97 MB)Issue paper with costs, ridership, engineering feasibility and operationsMar 1, 2005Environmental documents and technical reports
Potential extension - west summary - report (164.92 KB)Long range plan issue paper: question and findingsMar 1, 2005Environmental documents and technical reports
Potential extension - east - report (1.05 MB)Issue paper with costs, ridership, engineering feasibility and operationsMar 1, 2005Environmental documents and technical reports
Potential extension - east summary - report (136.12 KB)Long range plan issue paper: question and findingsMar 1, 2005Environmental documents and technical reports
Integration with Central Link - report (456.37 KB)Issue paper, part of a series of reports designed to inform the Sound Transit Board in its decision-making on the Regional Transit Long-Range Plan update for the service areaMar 1, 2005Environmental documents and technical reports
HCT system development issues in the south corridor - report (164.6 KB)Issue paper with costs, ridership, engineering feasibility, and operationsMar 1, 2005Environmental documents and technical reports
HCT system development issues in the south corridor summary - report (84.18 KB)Long range plan issue paper: question and findingsMar 1, 2005Environmental documents and technical reports
Feasibility study - report (3.51 MB)Feasibility study for the Puyallup Indians on route to Cascades Casino complexMar 1, 2004Environmental documents and technical reports

Types of library documents

Project information and meeting materials
Facts sheets, presentations, display boards

Board of Directors materials
Presentations to the Sound Transit Board

Environmental documents and technical reports
EIS documents, technical memoranda, reports

Other
Videos, illustrations, external links

About these documents

Documents may include graphics and drawings based on the early stages of design. Designs are subject to change as the project progresses. Not all project documents are available online. Contact us if you have questions.