Expansion Alternatives Analysis Report and SEPA Addendum

The final Alternative Analysis Report and SEPA Addendum for the Sound Transit Tacoma Link Expansion project is available (please see links below). The Alternatives Analysis report serves as a SEPA Addendum to the Regional Transit Long-Range Plan Final Supplemental EIS (Sound Transit, 2005). The AA report includes the evaluation of potential corridors and options for the future expansion of the current Tacoma Link system. The Sound Transit Board may identify a preferred corridor to advance into environmental documentation and conceptual design at their meeting on May 23, 2013.

Tacoma Link Expansion Alternatives Analysis Report and SEPA Addendum (.pdf, 5.9 MB)

Appendices A1-A5, Technical Documentation (.pdf, 8.7 MB)

Appendices B1-B4, Public Involvement (.pdf, 7.9 MB)


You can find additional project information in the Tacoma Link Expansion document archive.