Construction alert: Hilltop Tacoma Link Extension

Having trouble viewing this email? View it as a Web page.

Project update email banner for Hilltop Tacoma Link Extension

Construction alert

Construction map for Martin Luther King Jr Way and South 11th Street closure, Hilltop Tacoma Link Extension

MLK Jr. Way road closure at S 11th St. and Earnest S Brazil St.

Starting as early as Monday May 16th for about two weeks, the contractor will be closing the northbound direction of MLK Jr Way between S. 11th and Earnest S Brazil streets, which will also close the intersection to eastbound and westbound vehicle traffic at the intersection. Eastbound vehicles on S. 11 St. will be able to access northbound MLK Jr. Way. Southbound traffic on MLK will still be available and parking will be removed within the construction area. Pedestrian detours are in place to maintain a safe working site.

Along the project area the crews are continuing to finish the roadway restoration, adjust utilities, paint striping on the street, install crosswalks in various locations along the Hilltop Tacoma Link project area. Please allow for extra travel time to get to your final destination and follow detour signage (see below for details).

Access is open to hospitals, medical centers and the emergency department during construction.

Looking ahead the contractor is planning on connecting the existing T Line (Tacoma Link Line) to the Hilltop Tacoma Link Extension project. This will require a long term intersection closure of 9th and Commerce. The schedule and timeframe is to be determined but we will provide notification to the area once it is scheduled.

Please support your local businesses during construction and stay Loyal to the Local!

What

Construction and traffic restrictions along Stadium Way, N. 1st Street, N. 2nd St., Division Avenue, Martin Luther King Jr. Way and the Dome District

When

  • Week of May 16th (Inclement weather or unforeseen issues will push dates and times)

Where

Dome District:

  • Eastbound E 25th Street closure between G and K streets (Start as early as 5/16/22 for about 2 weeks). Access to businesses maintained.

Commerce/Stadium Way:

  • Northbound Commerce Street closure between I-705 and S 9th Street (Starts as early as 5/16/22)

Stadium District (N. E St., N 1st St., Division Ave.):

  • N. Tacoma Ave. and N. 1st Street intersection restoration of all 4 corners (Only one crosswalk to be closed at a given time). Vehicle and sidewalk access maintained. Parking removed near work areas (Start as early as 5/16/22 for about 2 weeks).
  • I Street and Division Ave. road restoration. Lane restrictions and crosswalk closures during the work. Vehicle and sidewalk access maintained. (Start as early as 5/16/22 for about 2 weeks)
  • N 2nd Street from N Yakima Ave. and I Street full street closure for roadway and sidewalk restoration

Hilltop/MLK Jr. Way:

  • Southbound MLK Jr. Way road closure between Division Ave and S. 6th Ave.
  • Northbound MLK Jr. Way road closure between S 11th and Earnest S Brazil streets (Starts as early as 5/16 for about 2 weeks)
  • S. 8th Street closure from Martin Luther King Jr. Way to S. L St.
  • S. 10th St. closure between MLK Jr. Way and S. J Street (local access to alley open)
  • S. 16th St. closure between MLK Jr. way and S. J Street (local access open to alley, garages and parking lots)
  • Southbound MLK Jr. Way road closure between S. 17th and S. 19th streets

More

  • Cross the street at only designated crosswalks. For wheelchairs, walkers, strollers and bicyclists cross tracks at a right angle. Obey all traffic signs and signals.
  • Driveway and pedestrian access is maintained, although some sidewalks and crosswalks will be temporarily closed. Pedestrian detours will be in place.
  • Buses will follow detour routes. Visit PierceTransit.org for information.
  • Construction noise related to removing pavement and operating equipment.
  • Large construction equipment or materials may be in the right-of-way.
  • Work will generally take place during the daytime hours unless otherwise noted. Daytime hours during the week are 7 a.m. to 9 p.m. The contractor usually works less hours.
  • Businesses are open during construction. Supports your local business and stay Loyal to the Local!
  • Plan ahead and allow extra time to reach your destination.
  • Due to inclement weather or unforeseen issues, dates and times are subject to change.

Contact us

Community Engagement: htlink@soundtransit.org or 206-398-5300
After-hours construction hotline: 888-298-2395

More updates


Your safety is our priority

Learn how to stay safe around our construction sites.

Stay safe