From 11 p.m. on Friday, Dec. 12, to 10 a.m. on Saturday, Dec. 13, 1 Line Shuttle buses will replace trains between Capitol Hill and Stadium stations.
In effect: Dec. 12-13
Routes: 1 Line
1 Line trains will arrive every 15 minutes between Lynnwood City Center and Capitol Hill stations, and every 10-15 minutes between Stadium and Federal Way Downtown stations.
1 Line Shuttle buses will arrive at closed stations every 10-15 minutes. Below are shuttle stops for affected stations:
Capitol Hill
- to Federal Way: Broadway & E Denny Way - Bay 4
Westlake
- to Lynnwood: 3rd Ave & Pine St
- to Federal Way: Pine St & 5th Ave
Symphony
- to Lynnwood: 3rd Ave & Union St
- to Federal Way: 3rd Ave & Union St
Pioneer Square
- to Lynnwood: 3rd Ave & James St
- to Federal Way: 3rd Ave & James St
International District/Chinatown
- to Lynnwood: 4th Ave S & S Jackson St
- to Federal Way: 5th Ave S & S Weller St
Stadium
- to Lynnwood: SODO Busway & S Royal Brougham Way
Starting at 9 p.m. on Monday, Dec. 8, to Saturday, Dec. 13, construction at Pinehurst Station will require 1 Line trains to share a track at Shoreline South/148th Station. Trains will serve the northbound/Lynnwood City Center side of the platform.
In effect: Dec. 8-14
Routes: 1 Line
Schedule and Platform Use:
Dec. 8-13: Lynnwood City Center platform - 9 p.m. – start of service
The schedule will extend past Dec. 13, with updates posted at stations and online.
For assistance at stations, call or text Security at (206) 398-5268. Subscribe to service alerts at soundtransit.org/alerts for updates.
1 Line trains are now serving Federal Way!
In effect: Dec. 6-14
Routes: 1 Line
Starting on September 11 through December 29, the south parking lot at Lynnwood Transit Center will be closed to vehicles. This is to allow for construction of a new trash enclosure.
In effect: Nov. 17 - Dec. 30
Routes: 1 Line
To get information about other transit parking lots and garages, please click the link below.
The work schedule is subject to change. For updates, please subscribe to service alerts. Visit the service alerts web page to sign up for alerts and current information on service disruptions.
SeaTac Airport Station 2nd pedestrian bridge elevator construction begins January 8, 2025.
In effect: Jan. 8, 3:00 a.m.
Routes: 1 Line
During times where pedestrian walkways are blocked and elevator access is unavailable, passengers may catch the Rapid Ride A Line bus from SeaTac Airport Station to Tukwila International Boulevard Station in order to use the 1 Line.
The pedestrian bridge from the station to the airport will be unaffected and available throughout the duration of this project.
Beginning February 10, 2025 half of the passenger pick up/drop off area will be closed, as will some parts of the plaza near the stairs and existing elevator as equipment begins to come in for construction of the new elevator.