Federal Way Link Extension Final Environmental Impact Statement

Final Environmental Impact Statement

On Nov. 18, 2016, Sound Transit and the Federal Transit Administration (FTA) published the Federal Way Link Extension (FWLE) Final Environmental Impact Statement (EIS), in accordance with the Washington State Environmental Policy Act (SEPA) and the National Environmental Policy Act (NEPA).

The Final EIS evaluates route and station alternatives, including the preferred alternative identified by the Sound Transit Board in July 2015. It describes potential impacts on the natural and built environment, possible mitigation measures, and responds to public comments received during the Draft EIS comment period, which ended on May 26, 2015.

Comments:
FTA will accept comments on the Final EIS for 30 days. All comments on the Final EIS are due by close of business on Dec. 19, 2016. All comments should include an addressee and return address. Please mail comments to the following address:

Attention: Federal Transit Administration, Region 10
Attn: Federal Way Link Extension Final EIS Comments
915 2nd Ave, Suite 3142
Seattle, WA 98174-1002

Or email them to: fta.tro10mail@dot.gov

After considering the analysis in the Final EIS, including public and agency comments and responses on the Draft EIS, the Sound Transit Board will select the project to build. The Board is expected to select the project to be built as early as January 2017.

Copies of the Final EIS:
An electronic copy of the Final EIS can be accessed at the links below. Hard copies of the Final EIS are available for $25 and hard copies of the separately bound technical reports are available for $15 each. The Executive Summary and a CD including the Final EIS, appendices, technical reports, and responses to comments received on the Draft EIS are available at no charge. For copies of the Final EIS documents, please contact Erin Green (206-398-5464 or erin.green@soundtransit.org) or Kent Hale (206-398-5103 or kent.hale@soundtransit.org).

Copies are also available for review at the following locations:

Sound Transit Office: 401 S Jackson St, Seattle
Des Moines Library: 21620 11th Ave S, Des Moines
Woodmont Library: 26809 Pacific Highway S, Des Moines
Kent Library: 212 2nd Ave N, Kent
Federal Way 320th Library: 848 320th Street, Federal Way
Federal Way Library: 34200 1st Way S, Federal Way
Washington State Library: 6880 Capitol Boulevard SE, Tumwater


Final EIS

Executive Summary (7.5 MB)

Table of Contents (0.3 MB)

Chapters 1-2: Purpose and Need; Alternatives Considered (6.9 MB)

Chapter 3: Transportation Environment and Consequences (5.1 MB)

Chapter 4:

Chapters 5-9: Construction; Cumulative Impacts; Environmental Justice; Alternatives Evaluation; Comment Summary (5.7 MB)

Appendices

Appendix A: Document Support Information (0.6 MB)

Appendix B: Public Involvement & Agency Coordination (0.9 MB)

Appendix C: Alternatives Analysis Reports and Scoping Summary Report

Appendix D: Technical Appendices

Appendix E: Section 4(f) and 6(f) Evaluation (2.1 MB)

Appendix F: Conceptual Design Drawings

Appendix G: Technical Reports

Appendix H: Mitigation Plan (0.2 MB)

Appendix I: Responses to Draft EIS Comments

Appendix J: Location of Preferred Alternative within I-5 Right of Way (3.0 MB)