Link light rail alert
Single tracking Ongoing

Update: Pinehurst Construction scheduled for tonight, August 11 has been canceled. 1 Line trains will no longer be sharing one track at Shoreline South/148th Station. Trains will resume normal service today.

In effect: Aug. 11-12

Routes: 1 Line
Affected stops:
Shoreline South/148th