Downtown Redmond Link Extension

Project Highlights

Mode:

  • Link light rail

Overview:

The Downtown Redmond Link Extension adds two new light rail stations beyond the future Redmond Technology Center Station being built as part of the East Link Extension.

This project was funded for construction as part of Sound Transit 3 Plan approved by voters in 2016.

Phase:

  • Environmental Review

Facts:

  • Length: 3.4 miles; 2 stations
  • Anticipated travel times:
    • Downtown Redmond to downtown Seattle: 45 minutes
    • Southeast Redmond to downtown Bellevue: 15 minutes

Region

  • East King County