Lynnwood Environmental Impact Statement

On April 1, 2015, Sound Transit released the Lynnwood Link Extension Final Environmental Impact Statement (Final EIS), in accordance with the Washington State Environmental Policy Act (SEPA). The Final EIS is also issued jointly by Sound Transit and the Federal Transit Administration (FTA) under the National Environmental Policy Act (NEPA). The Final EIS examines project route and station alternatives, including the preferred alternative identified by the Sound Transit Board. The Final EIS provides information about project alternatives, potential impacts on the natural and built environment, possible mitigation measures, and responds to public comments received during the Draft EIS comment period, which ended on September 23, 2013.

The Sound Transit Board will consider the Final EIS and public and agency comments in selecting the project to be built. The Board is expected to select the route and station sites and the project to be built on April 23, 2015.

Copies of the Final EIS: Hard copies of the Final EIS are available for $25 and hard copies of the separately bound technical reports are available for $15 each. The Executive Summary and a CD including the Final EIS, appendices, technical reports, and responses to comments received on the Draft EIS are available at no charge. For copies of the Final EIS documents, please contact Lauren Swift at 206-398-5301 or lauren.swift@soundtransit.org or Suzan Schneider at 206-903-7445 or suzan.schneider@soundtransit.org. Copies are also available at public libraries in the project area. The libraries where we are posting the document are below.

Seattle Public Libraries

Central Library, 1000 Fourth Avenue, Seattle
Northgate Branch, 10548 Fifth Avenue NE, Seattle

King County Library System

Shoreline Library, 345 NE 175th Street, Shoreline

Sno-Isle Libraries

Edmonds Library, 650 Main Street, Edmonds
Mountlake Terrace Library, 23300 58th Avenue West, Mountlake Terrace
Lynnwood Library, 19200 44th Avenue West, Lynnwood


Documents in .pdf format require the free Adobe Acrobat Reader to view.

EIS

Table of Contents, Fact Sheet, Summary  (10.6 MB)
Chapter 1: Purpose and Need & Chapter 2: Alternatives Considered (8.3 MB)
Chapter 3: Transportation Impacts and Mitigation (3.6 MB)
Chapter 4: Environmental Impacts and Mitigation (9.2 MB) 
Chapter 5: Evaluation of Alternatives (254 kB)
Chapter 6: Public Involvement & Chapter 7: Draft EIS Comments and Responses (372 KB)

Appendices

Appendix A: Index, Appendix B: Glossary, Appendix C: Environmental Justice Analysis, Appendix D: Section 4(f)/Section 6(f) Correspondence, Appendix E: List of Preparers (8 MB)

Appendix F: Conceptual Plans

Appendix G:  Visual Simulations and Illustrations

Appendix H: Other Projects Considered in Cumulative Effects,  Appendix I: Chapter 4 Supporting Information on Affected Environment and Environmental Impacts, Appendix J: References (10.4 MB)

Appendix K: Supporting Documents

Appendix L: Public Involvement and Agency Coordination, Appendix M: Distribution List, Appendix N: Mitigation Plan, Appendix O: Biological Assessment, Appendix Q: Northgate to Lynnwood Light Rail and I-5 Compatibility Report, Appendix R: Link Operations and Maintenance Satellite Facility Analysis (8 MB)

Appendix P: Draft EIS Public Comments and Responses

Technical Reports

Cultural, Archaeological, and Historic Resources (9.1 MB)

Ecosystem Resources 

Noise and Vibration

Transportation (9.1 MB)