East Link SEPA Addendum to the Final EIS

Sound Transit has prepared the SEPA Addendum to the Sound Transit East Link Light Rail Project Final Environmental Impact Statement (July 2011). The Addendum addresses potential refinements to the East Link Extension and provides new project related environmental information.

Please contact Elma Borbe at (206) 398-5445 or via email elma.borbe@soundtransit.org if you would like a CD copy of the addendum, which is free, or a paper copy for $15.00. It can also be reviewed at local libraries and at Sound Transit office 401 S. Jackson St., Seattle, WA 98104.

State Environmental Policy Act Addendum to the Final Environmental Impact Statement (.pdf, 5.5 MB)

Attachment A, project sketchups (.pdf, 4.7 MB)

Attachment B1, design plans and profiles (.pdf, 4.3 MB)

Attachment B2, design plans and profiles (.pdf, 5 MB)

Attachment B3, design plans and profiles (.pdf, 6.9 MB)

Attachment C, list of parcels potentially affected (.pdf, 140 KB)

Attachment D, visual simulations (.pdf, 3.9 MB)

Attachment E1, Part 1, noise technical memorandum-proposed refinements (.pdf, 2.2 MB)

Attachment E1, Part 2, noise technical memorandum-proposed refinements (.pdf, 1.1 MB)

Attachment E1, Part 3, noise technical memorandum-proposed refinements (.pdf, 5 MB)

Attachment E1, Part 4, noise technical memorandum-proposed refinements (.pdf, 5 MB)

Attachment E1, Part 5, noise technical memorandum-proposed refinements (.pdf, 5 MB)

Attachment E1, Part 6, noise technical memorandum-proposed refinements (.pdf, 4.8 MB)

Attachment E2, noise technical memorandum-SR 520 (.pdf, 928 KB)

Attachment E3, vibration technical memorandum (.pdf, 5.9 MB)

Attachment F, ecosystems (.pdf, 1.1 MB)

Attachment G, transportation technical memorandum (.pdf, 845 KB)