Sound Transit offers e-mail and text alert subscriptions. This service is free (text message charges may apply depending on your mobile service plan) and you can unsubscribe at any time. Sign up at the bottom of this page.

Sounder train

Sounder train has 4 alerts

Extra service Upcoming

Special event service on N Line and S Line will be available Sunday, Sept. 27, for the 12:10 p.m. Mariners game.

In effect: Sep. 27, 9:11 a.m. - 6:00 p.m.

Routes: N Line & S Line

Mariners vs. Los Angeles Angels

-S Line train will depart Lakewood at 9:11 a.m. and depart King Street Sta 45 minutes after the game ends.
-N Line train will depart Everett at 9:45 a.m. and depart King Street Sta 45 minutes after the game ends.

Want to spread out a bit on your Sounder S Line ride to the game? Head for the northernmost train cars—they're usually a lot less crowded!

Click the link below to get more information about alternative transportation options.
Announcement Ongoing

From Aug. 10, 2026, through Feb. 15, 2027, parking capacity will be reduced at Kent Sounder Station Garage due to construction.

In effect: Aug. 10, 2026 - Feb. 16, 2027

Routes: S Line

Passengers can still park at the garage and access the Kent Sounder Station during construction.
The project will repair and improve the concrete structure of the garage.

8/10/26 – 9/14/26: Parking level 5 will be closed. Updates to follow when available.

We apologize for any inconvenience. Subscribe to rider alerts for any changes.
Announcement Ongoing

Starting Monday, March 16, Sound Transit will close Kent Station’s northwest Sounder surface parking lot.

In effect: March 16, 2026 - Jan. 1, 2027

Routes: S Line

The only available spots for this lot will be three ADA parking spots. This closure will last the duration of this project phase. We expect this phase to be completed in December 2026. We encourage drivers to use the existing Kent garage at W Smith St and 1st Ave N.

For more information on the project, visit the Kent Station Parking and Access Improvement Project page.
Extra service Upcoming

Special event service on N Line and S Line will be available Sunday, Sept. 27, for the 12:10 p.m. Mariners game.

In effect: Sep. 27, 9:11 a.m. - 6:00 p.m.

Routes: N Line & S Line

Mariners vs. Los Angeles Angels

-S Line train will depart Lakewood at 9:11 a.m. and depart King Street Sta 45 minutes after the game ends.
-N Line train will depart Everett at 9:45 a.m. and depart King Street Sta 45 minutes after the game ends.

Want to spread out a bit on your Sounder S Line ride to the game? Head for the northernmost train cars—they're usually a lot less crowded!

Click the link below to get more information about alternative transportation options.

ST Express bus

ST Express bus has 10 alerts

Stop relocation Ongoing

Stop #76870 NE Bothell Way & 68th Ave NE (EB) and Stop #76880 NE Bothell Way & 73rd Ave NE (EB) relocated from Wed Apr 22, 2026 through Thu April 22, 2027 due to construction.

In effect: Aug. 29, 2026 - April 23, 2027

Routes: 522

Affected routes:
322
331
981
ST 522

Get on/off:
Routes 331 to UW Bothell, 981 to Mercer Island and ST 522 to Woodinville:
The temporary stop on NE Bothell Way, just east of the regular stop (EB)

Route 322 to Kenmore P&R:
Stop #70022 68th Ave Ne & Ne Bothell Way (NB)
Stop #76376 Kenmore Park & Ride & 73rd Ave Ne (EB)
Multi route reroute Ongoing

Routes 220, 240, ST 556 and ST 566 will be rerouted around Bellevue Transit Center from Sat Aug 29 through Sun Dec 20 due to construction.

In effect: Aug. 29 - Dec. 21

Routes: 556 & 566

Affected stops:
Stop #68005 Bellevue Transit Center - Bay 5 (EB)
Stop #67652 Bellevue Transit Center - Bay 9 (WB)
Stop #67655 Bellevue Transit Center - Bay 8 (WB)
Stop #68006 Bellevue Transit Center - Bay 6

Get on/off at:
For Route 220 to Bellevue TC and to Eastgate P&R, and ST 556 to Bellevue:
The temporary stop on 110th Ave NE, just south of NE 6th St (SB)

For ST 566 to Auburn and ST 556 to Issaquah:
Stop #85630 Bellevue Transit Center BAY 1 (SB)

For Route 240 to Renton and to Bellevue TC:
Stop #85630 Bellevue Transit Center Bay 1(SB)

For ST 560 to Westwood Village:
The temporary stop on 110th Ave NE, just south of NE 6th St (SB)

For ST 532 to Everett, ST 535 to Lynnwood, and Route 908 to Snohomish P&R:
The temporary stop on 110th Ave NE, just south of NE 6th St (NB)
Service revision Ongoing

Beginning Sat Aug 29, Route ST 556 will not use the stops #80486 Front St S & E Sunset Way (SB) and #80484 Front St S & SE Andrews St (NB).

In effect: Aug. 29 - Sep. 27

Routes: 556

Affected stops:
Stop #80486 Front St S & E Sunset Way (SB)
Stop #80484 Front St S & SE Andrews St (NB)

For ST 556 to Issaquah get on/off at:
Stop #80485 E Sunset Way & Rainier Blvd S (EB)
Stop #65140 E Sunset Way & 6th Ave NE (EB)

For ST 556 to Bellevue TC get on/off at:
Stop #64480 E Sunset Way & 6th Ave NE (WB)
Stop #64502 E Sunset Way & 1st Ave NE (WB)

This scheduling data change will be available in Metro’s Trip Planner and third-party transit planning applications after Saturday, September 26. We apologize for the confusion regarding this new service and appreciate your patience as the updated information becomes available.
Announcement Ongoing

Real time bus arrival and tracking is currently unavailable for Route ST 556 in Metro's Online Trip Planner and Text for Departures tool.

In effect: Sep. 15, 12:30 p.m.

Routes: 556

Due to technical problems, real time bus information for Route ST 556 is currently unavailable in Metro's Online Trip Planner and Text for Departures tool.

When real time information is not displaying, please refer to the scheduled time for your bus.

Transit staff are working to resolve the issue and to restore real time data as soon as possible.

We apologize for the inconvenience and appreciate your patience.
Reroute Ongoing

ST Express 560 is rerouted from Fri Sep 25 at 11:00 PM through Mon Sep 28 at 4:00 AM

In effect: Sep. 25-28

Routes: 560

Affected direction: Westbound

Missed stops:
Newport Hills Fwy Station
Kennydale Fwy Station
Reroute Ongoing

ST Express 560 is rerouted at the Bellevue Transit Center until further notice due to construction.

In effect: July 27, 11:44 a.m.

Routes: 560

Affected stops:
Bellevue TC - Bay 6 (outbound)
Bellevue TC - Bay 7 (inbound)

Use stop:
Temporary stop 110th Ave NE, just south of NE 6th St
Multi route reroute Ongoing

Routes 220, 240, ST 556 and ST 566 will be rerouted around Bellevue Transit Center from Sat Aug 29 through Sun Dec 20 due to construction.

In effect: Aug. 29 - Dec. 21

Routes: 556 & 566

Affected stops:
Stop #68005 Bellevue Transit Center - Bay 5 (EB)
Stop #67652 Bellevue Transit Center - Bay 9 (WB)
Stop #67655 Bellevue Transit Center - Bay 8 (WB)
Stop #68006 Bellevue Transit Center - Bay 6

Get on/off at:
For Route 220 to Bellevue TC and to Eastgate P&R, and ST 556 to Bellevue:
The temporary stop on 110th Ave NE, just south of NE 6th St (SB)

For ST 566 to Auburn and ST 556 to Issaquah:
Stop #85630 Bellevue Transit Center BAY 1 (SB)

For Route 240 to Renton and to Bellevue TC:
Stop #85630 Bellevue Transit Center Bay 1(SB)

For ST 560 to Westwood Village:
The temporary stop on 110th Ave NE, just south of NE 6th St (SB)

For ST 532 to Everett, ST 535 to Lynnwood, and Route 908 to Snohomish P&R:
The temporary stop on 110th Ave NE, just south of NE 6th St (NB)
Reroute Ongoing

ST Express 578 is rerouted beginning at 12:00 PM until further notice due to special event

In effect: April 4, 12:00 p.m.

Routes: 578

Get on/off buses at:
State St & Traffic Ave

Affected stops:
Sumner Station - Bay 2 (outbound)
Sumner Station - Bay 1 (inbound)
Stop move Ongoing

ST Express 577 and ST Express 578 will experience a stop closure until further notice: Federal Way Downtown Station - Bay 3 (inbound)

In effect: March 24, 1:50 p.m.

Routes: 578

Affected stop:
Federal Way Downtown Station - Bay 3

Get on/off:
Federal Way Downtown Station - Bay 7
Reroute Ongoing

ST Express 595 is rerouted until further notice due to construction

In effect: June 23, 6:03 p.m.

Routes: 595

Affected stops:
6th Ave & Skyline Dr N

Stations

Stations has 9 alerts

Single tracking Ongoing

2 Line trains are sharing one track at BelRed and Overlake Village stations through end of service for scheduled track maintenance. Please board all trains on the platform to Lynnwood City Center.

In effect: Sep. 26-27

Routes: 2 Line

Please pay attention to train and station announcements. Real-time transit information from other sources may temporarily be inaccurate during scheduled track maintenance.
Elevator closure Ongoing

Capitol Hill Station - Elevator 1 unavailable until further notice due to unscheduled outage.

In effect: Sep. 26, 9:36 p.m.

Routes: 1 Line & 2 Line

To ride the 1 Line from the street:

1. Go to Broadway Ave E and turn right toward E John St.
2. Enter the station at the corner of E John St and Broadway Ave E.
3. Take the street level elevator down to the North Mezzanine for elevator access to the platform.

To ride the 1 Line from the South Mezzanine:

1. Take the pedestrian walkway toward the west exit.
2. Take elevator up to the street.
3. Turn left on Broadway Ave E.
4. Enter the station at the corner of E John St and Broadway Ave E.
5. Take the street level elevator down to the North Mezzanine for.

To exit the station from the platform:

1. Go to the opposite end of the platform toward the E John St exit.
2. Take the platform elevator to the North Mezzanine.
3. Take the elevator at the North Mezzanine up to the street (E John St & Broadway Ave E) elevator access to the platform.
Announcement Ongoing

From Aug. 10, 2026, through Feb. 15, 2027, parking capacity will be reduced at Kent Sounder Station Garage due to construction.

In effect: Aug. 10, 2026 - Feb. 16, 2027

Routes: S Line

Passengers can still park at the garage and access the Kent Sounder Station during construction.
The project will repair and improve the concrete structure of the garage.

8/10/26 – 9/14/26: Parking level 5 will be closed. Updates to follow when available.

We apologize for any inconvenience. Subscribe to rider alerts for any changes.
Announcement Ongoing

Starting Monday, March 16, Sound Transit will close Kent Station’s northwest Sounder surface parking lot.

In effect: March 16, 2026 - Jan. 1, 2027

Routes: S Line

The only available spots for this lot will be three ADA parking spots. This closure will last the duration of this project phase. We expect this phase to be completed in December 2026. We encourage drivers to use the existing Kent garage at W Smith St and 1st Ave N.

For more information on the project, visit the Kent Station Parking and Access Improvement Project page.
Announcement Ongoing

From Tuesday, Sept. 8, through Friday, Oct. 2, from 6 a.m. to 5 p.m. daily, sidewalk revision work will take place at 77th Ave SE near the west entrance to Mercer Island Station.

In effect: Sep. 8 - Oct. 2

Routes: 2 Line

This work will take place outside the west entrance of 77th Ave SE. The sidewalk will be closed to northbound traffic during working hours, including the drop-off/pick-up location.

The sidewalk to the north of this entrance will be closed for the duration of the project, so passengers can only access this entrance from the south.
Single tracking Ongoing

2 Line trains are sharing one track at BelRed and Overlake Village stations through end of service for scheduled track maintenance. Please board all trains on the platform to Lynnwood City Center.

In effect: Sep. 26-27

Routes: 2 Line

Please pay attention to train and station announcements. Real-time transit information from other sources may temporarily be inaccurate during scheduled track maintenance.
Elevator closure Ongoing

Pioneer Square Station - Elevator 701 unavailable until further notice due to unscheduled outage.

In effect: Sep. 26, 4:06 p.m.

Routes: 1 Line & 2 Line

To ride the 1 Line to Lynnwood:

1. Cross the North Mezzanine.
2. Take the elevator down to the Federal Way platform.
3. Go to the opposite end of the Federal Way platform toward Exit C.
4. Take the elevator up to the South Mezzanine.
5. Cross the South Mezzanine.
6. Take the elevator down to the Lynnwood platform.

To exit the station:

1. Go to the opposite end of the platform.
2. Take the elevator up to the South Mezzanine.
3. Take the elevator at Exit C (3rd Ave & Yesler Way) up to the street.
Elevator closure Ongoing

Star Lake Station Garage - Elevator 2 unavailable until further notice due to unscheduled outage.

In effect: Sep. 26, 11:05 p.m.

Routes: 1 Line

To ride the 1 Line:

1. Take the adjacent elevator to the station entrance level (floor 3).
2. Enter the station through Exit A.
3. Take the elevator or the ramp to the platforms.

To exit the station:

1. Take the adjacent elevator to the street level.
2. Exit the garage.
Announcement Ongoing

From Jul. 22 through Sept. 30, Tukwila International Boulevard Station will have reduced parking capacity due to construction. Passengers may use Angle Lake Station for additional parking.

In effect: July 22 - Oct. 1

Routes: 1 Line

Passengers can still access Tukwila International Boulevard Station during construction.

The project will improve the drainage system for this station's stairwells.

Parking capacity will be reduced due to equipment storage. Additional parking spaces can be found at Angle Lake Station.

We apologize for any inconvenience. Subscribe to rider alerts for any changes.

Announce­ments

There are no alerts for this category.