Sound Transit offers e-mail and text alert subscriptions. This service is free (text message charges may apply depending on your mobile service plan) and you can unsubscribe at any time. Sign up at the bottom of this page.
Service alerts
Link light rail
Starting at 8 p.m. on Monday, Apr. 6, through Friday, Apr. 10, construction at Pinehurst Station will require 1 Line trains to share a track at Shoreline South/148th Station. Trains will serve the southbound/Federal Way Downtown side of the platform.
In effect: April 6-11
Routes: 1 Line & 2 Line
Expect 16-minute wait times from 11:00 p.m. until the end of service. Trains between Northgate and International District/Chinatown will run every 8 minutes. Regular service resumes each morning.
There will be no northbound 2 Line service from Downtown Redmond Station to Lynnwood after 8 p.m. All northbound 2 Line passengers must exit at Northgate Station and transfer to a northbound 1 Line train to continue to Lynnwood City Center Station.
Schedule and Platform Use:
Apr. 6 - Apr. 10: Federal Way Downtown platform – 8 p.m. - Start of service
The schedule will extend past Apr. 10, with updates posted at stations and online.
For assistance at stations, call or text Security at (206) 398-5268.
Subscribe to service alerts at soundtransit.org/alerts for updates.
Last updated: Mar 24, 2026 4:35 PM.
Click here for more information: https://www.soundtransit.org/1
From April 14 -17, from 10 p.m. to the end of service, shuttle buses will replace trains between Downtown Redmond Station and Bel-Red Station.
In effect: April 14-17
Routes: 2 Line
- The last Lynnwood-bound 2 Line train serving all stations will depart from Downtown Redmond Station at 10:30 p.m., reaching Lynnwood City Center Station at 11:48 p.m.
- The last Redmond-bound 2 Line train serving all stations will depart Lynnwood City Center at 9:16 p.m., reaching Downtown Redmond Station at 10:33 p.m.
2 Line shuttle buses between Downtown Redmond Station and Bel-Red Station will run every 10 - 15 minutes.
Affected stops:
Downtown Redmond
• To Lynnwood: Downtown Redmond Station - Bay 3
• To Downtown Redmond: Downtown Redmond Station - Bay 2 (drop off only)
Marymoor Village
• To Lynnwood: Marymoor Village Station –- Bay 4
• To Downtown Redmond: Marymoor Village Station - Bay 2
Redmond Technology
• To Lynnwood: Redmond Technology Station - Bay 4
• To Downtown Redmond: Redmond Technology Station - Bay 5
Overlake Village
• To Lynnwood: 152nd Ave NE & Da Vinci Ave NE
• To Downtown Redmond: 152nd Ave NE & NE Shen St
Bel-Red
• To Lynnwood: 132nd Ave NE & NE Spring Blvd
• To Downtown Redmond: 132nd Ave NE & NE Spring Blvd
Starting at 8 p.m. on Monday, Apr. 6, through Friday, Apr. 10, construction at Pinehurst Station will require 1 Line trains to share a track at Shoreline South/148th Station. Trains will serve the southbound/Federal Way Downtown side of the platform.
In effect: April 6-11
Routes: 1 Line & 2 Line
Expect 16-minute wait times from 11:00 p.m. until the end of service. Trains between Northgate and International District/Chinatown will run every 8 minutes. Regular service resumes each morning.
There will be no northbound 2 Line service from Downtown Redmond Station to Lynnwood after 8 p.m. All northbound 2 Line passengers must exit at Northgate Station and transfer to a northbound 1 Line train to continue to Lynnwood City Center Station.
Schedule and Platform Use:
Apr. 6 - Apr. 10: Federal Way Downtown platform – 8 p.m. - Start of service
The schedule will extend past Apr. 10, with updates posted at stations and online.
For assistance at stations, call or text Security at (206) 398-5268.
Subscribe to service alerts at soundtransit.org/alerts for updates.
Last updated: Mar 24, 2026 4:35 PM.
Click here for more information: https://www.soundtransit.org/1
East stairwell at South Bellevue Station Garage is closed
In effect: May 20, 5:17 a.m.
Routes: 2 Line
Affected lines:
2 Line
Free T Line Shuttles are replacing T Line service for rail repair until end of service Thursday, April 9. All T Line stations are closed until April 10.
In effect: April 6-10
Routes: T Line
Tacoma Dome:
-to Tacoma Dome: E 25th St & E D St
-to St Joseph: E 25th St & E D St
S 25th St:
-to Tacoma Dome: S 25th St & A St
-to St Joseph: S 25th St & A St
Union Station:
-to Tacoma Dome: Pacific Ave & S 19th St
-to St Joseph: Pacific Ave & S 19th St
Convention Center:
-to Tacoma Dome: Commerce St & S 13th St
-to St Joseph: Commerce St & S 13th St
Theater District:
-to Tacoma Dome: Commerce St & S 11th St
-to St Joseph: Commerce St & S 11th St
Old City Hall:
-to Tacoma Dome: Commerce St & S 7th St
-to St Joseph: Commerce St & S 7th St
S 4th St:
-to Tacoma Dome: S Stadium Way & S 4th St
-to St Joseph: S Stadium Way & S 4th St
Stadium District:
-to Tacoma Dome: N 1st St & N Tacoma Ave
-to St Joseph: N 1st St & N Tacoma Ave
Tacoma General:
-to Tacoma Dome: Division Ave & N K St
-to St Joseph: MLK Jr Way & S 6th Ave
6th Ave:
-to Tacoma Dome: MLK Jr Way & S 6th Ave
-to St Joseph: MLK Jr Way & S 6th Ave
Hilltop District:
-to Tacoma Dome: MLK Jr Way & S 11th St
-to St Joseph: MLK Jr Way & S 11th St
St Joseph:
-to Tacoma Dome: MLK Jr Way & S 19th St
-to St Joseph: MLK Jr Way & S 18th St
See travel options in the link below to assist you with your ride. Please plan ahead for additional travel time.
Sounder train
Starting Monday, March 16, Sound Transit will close Kent Station’s northwest Sounder surface parking lot.
In effect: March 16, 2026 - Jan. 1, 2027
Routes: S Line
For more information on the project, visit the Kent Station Parking and Access Improvement Project page.
ST Express bus
ST 522 is rerouted off I-405 and SR 522 between NE 195th St and 131st Ave NE Fri Apr 10th to Sat Apr11th from 10:00 PM to 4:00 AM nightly due to construction.
In effect: April 10-12
Routes: 522
Stop #76970 Sr 522 & 132nd Ave NE (EB)
Get on/off at:
Temporary stop on 132nd Ave NE just north of NE 180th St (NB)
Stations
Capitol Hill Station elevator 1 out of service due to scheduled maintenance. The elevator at the E Denny Way exit serving the street, South Mezzanine, and platform is out of service. See below for alternate route information.
In effect: March 27, 9:35 p.m.
Routes: 1 Line & 2 Line
1. Go to Broadway Ave E and turn right toward E John St.
2. Enter the station at the corner of E John St and Broadway Ave E.
3. Take the street level elevator down to the North Mezzanine for elevator access to the platform.
To ride the 1 Line and 2 Line from the South Mezzanine:
1. Take the pedestrian walkway toward the west exit.
2. Take elevator up to the street.
3. Turn left on Broadway Ave E.
4. Enter the station at the corner of E John St and Broadway Ave E.
5. Take the street level elevator down to the North Mezzanine for elevator access to the platform.
To exit the station from the platform:
1. Go to the opposite end of the platform toward the E John St exit.
2. Take the platform elevator to the North Mezzanine.
3. Take the elevator at the North Mezzanine up to the street (E John St & Broadway Ave E).
Escalator upgrades at Int'l Dist/Chinatown Station
In effect: Nov. 23, 7:26 p.m.
Routes: 1 Line & 2 Line
Exit B – to 5th Ave S & King St:
• Escalator 903 from Lynnwood platform – out of service
• Escalator 904 from Federal Way platform – out of service
Passengers who need assistance while at a Sound Transit station, can call or text Security at (206) 398-5268.
Starting Monday, March 16, Sound Transit will close Kent Station’s northwest Sounder surface parking lot.
In effect: March 16, 2026 - Jan. 1, 2027
Routes: S Line
For more information on the project, visit the Kent Station Parking and Access Improvement Project page.
Lynnwood City Center Station - Elevator 2 unavailable until further notice due to maintenance.
In effect: April 8, 7:05 a.m.
Routes: 1 Line & 2 Line
1. Exit the station through the Northeast Station Plaza.
2. Cross 46th Ave W and go through the Southwest Station Plaza.
3. Enter the station through Exit B and take the elevator up to the platform.
To exit the station:
1. Go to the opposite end of the platform.
2. Take the elevator down to the street.
Mountlake Terrace Station Garage - Elevator 1 is unavailable until further notice due to maintenance.
In effect: April 8, 8:00 a.m.
Routes: 1 Line & 2 Line
1. Take the adjacent elevator to the street level.
To ride Sound Transit Express Buses:
1. Take the adjacent elevator up to level "3
SeaTac Airport Station 2nd pedestrian bridge elevator construction begins January 8, 2025.
In effect: Jan. 8, 3:00 a.m.
Routes: 1 Line
During times where pedestrian walkways are blocked and elevator access is unavailable, passengers may catch the Rapid Ride A Line bus from SeaTac Airport Station to Tukwila International Boulevard Station in order to use the 1 Line.
The pedestrian bridge from the station to the airport will be unaffected and available throughout the duration of this project.
Beginning February 10, 2025 half of the passenger pick up/drop off area will be closed, as will some parts of the plaza near the stairs and existing elevator as equipment begins to come in for construction of the new elevator.
Additional information about changes in elevator accessibility will be provided as it comes available.
East stairwell at South Bellevue Station Garage is closed
In effect: May 20, 5:17 a.m.
Routes: 2 Line
Affected lines:
2 Line
Elevator outage at University of Washington Station. The elevator at the Husky Stadium exit serving the street (Montlake Blvd NE), pedestrian bridge, and platform is out of service.
In effect: March 29, 9:21 p.m.
Routes: 1 Line & 2 Line
1. Take the elevator located directly across from the out of service unit down to the platform.
To exit the station:
1. Take the nearby elevator located directly across from the out of service unit up to the street or pedestrian bridge to Montlake Blvd NE.
Announcements
There are no alerts for this category.